Flyingbelt transports 500 tons of building material per hour

28.10.2019

In the Haltern-Lippramsdorf and Marl region, about a one hour drive north-west of Dortmund, Bunte is currently building levees along the River Lippe – the longest river in Westphalia – on behalf of the Lippeverband public water board. LEITNER ropeways recently installed an AGUDIO Flyingbelt there to transport roughly 500 tons of building material per hour. 

Your press contact:
LEITNER AG / SpA, Brennerstraße 34, 39049 Sterzing, Italy
Photos
FlyingBelt Lippe / Marl (DE)
FlyingBelt Lippe / Marl (DE)
28.10.2019
© Rupert Oberhaeuser
Download
FlyingBelt Lippe / Marl (DE)
FlyingBelt Lippe / Marl (DE)
28.10.2019
© Rupert Oberhaeuser
Download
FlyingBelt Lippe / Marl (DE)
FlyingBelt Lippe / Marl (DE)
28.10.2019
© Rupert Oberhaeuser
Download